2012 Jobs Completed
Yakama Nation
- Eagle Rock LWD Enhancement Methow River
- Project consisted of placing LWD structures with piling and cable along the Methow River. PZC Sheet Piling was placed for coffer dam along with turbidity curtain and pumps to control
sediment.
2011 Jobs Completed
Cowlitz Indian Tribe Main Contractor
- Eagle Island
- Install Piling in placed LWD
2010 Job Completed
Cowlitz County Soil Conservation District
- Abernathy Creek – Robert Strom
- Place Log Jams and In-Stream Structures
Log Pilings and building structures with logs and tying them together with rebar and cables. Placed in and out of the water.
Wahkiakum Conservation District
- Elochamen River Bank Restoration
- Private Property place log piling and root wads for bank stabilization and habitat.
2009 Jobs Completed
Lower Columbia Fish Enhancement Group
- Grays River Piling
- Piling Placed in river with log jams
- Place log piling with root wads and LWD in river bed.
- Toutle River at Steelhead Landing
- Piling placed in log jams and structures
Place log piling with root wads and LWD in river bed.
- Procters on the Cedar Creek
- Piling placed in log jams along river bank
Place log piling with root wads and LWD in river bed.