1999 Community Pride Design Awards
For Cedar Creek/Chelatchie Railroad – Fish Passage Improvement
2012 Jobs Completed
Cat Works Construction LLC
- Kalama River Rd Slide Repair
- Install 14” x 40’ and 14” x 55’ H Pile for Slide Control
- Tower Road Slide Repair
- Install 12” x 35’ H Pile for Slide Control
Halme Excavating
- CSO 39&40
- Install Temporary 14” x 35’+/- H Pile for Shoring
R & G Excavating
- Winston Green WWTP Phase II
- Install 65’ of PZC 13 Sheet Pile for Temporary Shoring
Rayonier Forest Products
- Deep River Shoring
- Project consisted of installing AZ Sheet Piling for a coffer dam on both sides of the dike for a culvert replacement.
Rotschy Inc
- Chehalis Casin Boistfort Road
- Installed a casing under the road way.
- Grain Terminal #7 Utility Sleeves
- Project consisted of installing casing under railroad track.
- Oak Lodge
- Project consisted of installing 100’ x 25’ AZ shoring to protect existing building.
Tapani Underground
- St. Johns Temporary Shoring
- Project consisted of various sizes of H Pile for temporary shoring around bridge footings.
- Winlock Emergency Shoring
- Install and remove 45’ x 20’+/- deep of PZC Sheet Piling.
2010 Job Completed
Old Apostolic Lutheran Church
- Install 144 90’ pipe piling for building foundation.
Tapani Underground
- Julia Butler Hanson Wildlife Refuge
- Sheet Piling for Box Culvert Ends and Temporary Coffer Dams
Sub Contracted for US Army Corp
Place sheet piling for box culvert ends working in the tidal influence.
2009 Jobs Completed
Tapani Underground
- Julia Butler Hanson Wildlife Refuge
- Sheet Piling for Box Culvert Ends and Temporary Coffer Dams
Sub Contracted for US Army Corp
Place sheet piling for box culvert ends working in the tidal influence.
Place piling in wetlands for board walk.